Our references
First in Poland Large Scale District Cooling Installation in Technology Industrial Park:
CCHP Installation, 2.8 MW electricity, 3.1 MW heating and 2.2 MWcooling
Total 7 buildings and 1 data center.
EDF Turn-key Project, 2012

Retrofit of cooling systems in Polish cooking plants total number of three:
Zdzieszowice Plant – 12,6 MW
Przyjażń Plant – 15,6 MW
Victoria Plant – 4,6 MW
Full engineering consultancy.

AZOTY GROUP – Tarnów
2 x conceptual design of heat recovery.
1 x environmental and energy efficiency assessment.
1 x BOT installation reducing energy consumption for cooling purposes by 97%!
Complete engineering and operation.

OSSA Congress Center WARSAW
Multi-generation solution – solar, geothermal, waste heat recovery
Cooling capacity – 1,1 MWc
Solar capacity – 500 kWh
Heating capacity – 2,5 MWh
Innovative solution with AGH University of Science and Technology.

Municipal Waste Disposal Plant in Szczecin
Absorption Heat Recovery from flue gas humidity condensation.
Capacity 10 MW (two steam units).
NET supplied full engineering.
Biggest HRH installation in European Power Generation sector.

Wrocław Technology Park
The most advanced commercial CHCP+ installation In Poland
2 x Absorption chillers 2,2 MWc
2 x Compressor chillers
1 x Adsorption chiller
2 x CHP gas engines 3,12 MWh / 2,8 MWe
Complete CHCP installation.

University Clinical Hospital in Białystok
2 x 1163 kWc steam supplied chillers
4 x DryCooler with adiabatic spray system
Complete cooling source installation.

The Holy Family Hospital in Warsaw
1 x 541 kWc got water chiller
1 x Open circuit cooling tower
1 x Compressor chiller
Complete CHCP installation.

Bydgoszcz Oncology Center
1 x 600 kWc supplied with steam from medical waste incinerator plant.
1 x open cooling tower
Complete engineering support.

EDF Zielona Góra Power Plant
First Commercial Local District Cooling in Poland.
1 x Adsorption chiller supplied from DHN working for Air – Conditioning.
Complete engineering by NET

Fortum Częstochowa Power Plant
First Local District Cooling in Poland.
1 x Adsorption chiller supplied from DHN
Working for Air – Conditioning.
Complete engineering by NET

EC Zielona Góra EDF – ADS
Fully Commercial Installation
1 x 50 kWc supplied from District
Heating Network
1 x open type Cooling Tower

EC Zielona Góra EDF – ADS
Fully Commercial Installation
1 x 120 kWc supplied from
District Heating Network
1 x open type Cooling Tower

New District Hospital in Wrocław
2 x 850 kWc hot water chillers
2 x Closed circuit towers